The temperatures are dropping. November at Nová Myslivna brings heating system testing

November
2026

Back in July, we showed you how a specialist crane was used to lift heat pumps onto the rooftops of Nová Myslivna. With winter approaching, heating is once again taking centre stage, this time with system testing underway. So, what else is happening on site this November?

Bringing warmth home. Quite literally.

Work on connecting the heat pumps and insulating the pipework is continuing, alongside the installation of equipment in the boiler rooms. At the same time, heating tests are underway to ensure that the entire system is operating as intended.

It's the little things that make a difference

Turning on a light, plugging in a coffee machine or setting the perfect temperature in your bedroom on a hot summer's day. These everyday comforts may seem simple, but making them possible takes a great deal of work behind the scenes.

This month's schedule includes the installation of electrical sockets and light switches, as well as the fitting of air conditioning units. Work is also progressing on internal plastering, plasterboard ceilings, painting, and the installation of wall and floor tiles.

A home extends beyond your front door

The shared spaces that residents will use every day deserve just as much attention. November's programme includes work on staircases, floor tiling in communal areas and the installation of epoxy flooring in the basement storage units. Preparations for the garage floors are also underway.

Further work is focusing on the installation of technical systems serving the future fitness centre and reception facilities.

And what about the outdoors?

Last month, we introduced you to the green roofs. Work on these continues throughout November, with the installation of aggregate and growing substrate to create the foundation for the future vegetation.

Meanwhile, façade and terrace works are progressing, along with the installation of railings and preparations for external shading systems.

So, what does Nová Myslivna look like as winter approaches? Take a look at our November photo gallery.

So you're not out of the loop

VIEW ALL NEWS

A Home for Every Generation: How Our Housing Needs Change Over Time

The perfect home at 30? A spacious living room, a home office and plenty of room to pursue your own plans. Ten years later, things may look very different. The home office becomes a child’s bedroom, priorities shift, and what once felt like enough no longer meets your needs. Yet one thing remains the same: the desire for a home where we feel truly comfortable.
November
2026

A Home for Every Generation: How Our Housing Needs Change Over Time

The perfect home at 30? A spacious living room, a home office and plenty of room to pursue your own plans. Ten years later, things may look very different. The home office becomes a child’s bedroom, priorities shift, and what once felt like enough no longer meets your needs. Yet one thing remains the same: the desire for a home where we feel truly comfortable.
November
2026

From Green Roofs to New Doors: October at Nová Myslivna

Green roofs, terraces, cladding and new doors. October brought a wide range of construction activities to Nová Myslivna, with work progressing simultaneously across both the exterior and interior of the development. While some of the changes are immediately visible, others deserve a closer look.
October
2026

From Green Roofs to New Doors: October at Nová Myslivna

Green roofs, terraces, cladding and new doors. October brought a wide range of construction activities to Nová Myslivna, with work progressing simultaneously across both the exterior and interior of the development. While some of the changes are immediately visible, others deserve a closer look.
October
2026

Parking is standard. Comfort is not.

Parking has become a natural part of any modern residential development. Increasingly, however, attention is also being paid to how this space is designed and how it contributes to the overall comfort of living. Parking is one of the details receiving growing attention in premium developments. In some residences around the world, this approach is taken to the extreme. At Porsche Design Tower in Miami, for example, cars are transported by elevator directly to private garages within individual residences. But this is not about car elevators or making a statement. What matters is the idea behind it: arriving home is just as much a part of the living experience as everything that happens behind the front door.
October
2026

Parking is standard. Comfort is not.

Parking has become a natural part of any modern residential development. Increasingly, however, attention is also being paid to how this space is designed and how it contributes to the overall comfort of living. Parking is one of the details receiving growing attention in premium developments. In some residences around the world, this approach is taken to the extreme. At Porsche Design Tower in Miami, for example, cars are transported by elevator directly to private garages within individual residences. But this is not about car elevators or making a statement. What matters is the idea behind it: arriving home is just as much a part of the living experience as everything that happens behind the front door.
October
2026

Construction work is continuing across the entire site

With each passing month, it becomes easier to see how the entire project at Nová Myslivna is taking shape. Work continues on the exterior of the building, while significant progress is also being made inside. Technical installations are being completed, work on the shared spaces is moving forward, and the lifts are gradually being installed. The first interiors are also starting to offer a clearer picture of what life at Nová Myslivna will look like.
September
2026

Construction work is continuing across the entire site

With each passing month, it becomes easier to see how the entire project at Nová Myslivna is taking shape. Work continues on the exterior of the building, while significant progress is also being made inside. Technical installations are being completed, work on the shared spaces is moving forward, and the lifts are gradually being installed. The first interiors are also starting to offer a clearer picture of what life at Nová Myslivna will look like.
September
2026

The call of the wild…

If you're interested in more information, leave us your contact details and we'll get back to you as soon as possible.

I am interested in
By submitting the form, I accept the personal data processing terms.
* Mandatory
Send
Your message was send
Sending failed. Please try again.